Specifications include, but are not limited to: o Pictures must be provided to include material delivery, through each step, to housing inspector during repair. Pictures must be clear, and referenced to home being worked on. Pictures are to be provided in real time, prior to home being completed. Third party apps such as Company Cam® are acceptable. o Areas that are found to be spaced decked shall be covered with ½” exterior grade sheathing material after removing the existing decking. It is the contractors responsibility to ensure the framing and structure will support the additional load. o Remove existing roofing materials down to bare decking. o Check all roof trusses/rafters and repair/replace as needed to ensure that new roof structure is flat and smooth without rises or depressions in roof system. o Replace all rotten, broken, un-even, weak, or deteriorated decking framing; including supporting roofing system such as rafter tails, facia and etc. o Any exposed repaired or replace wood should be protected from the elements, painted to match existing color or white. o Replaced/repaired decking shall be level and ready to accept felt and shingles. o Check all roof trusses for strength and stability before re-shingling house. o Remove all unused elements, vents, etc., that are not operational and close them below roof level. o Re-flash all valleys, vents, roof openings, and chimneys. o Install new boots around all roof penetrations. o Haul away debris immediately. o Use a magnetic sweep around the perimeter of house and rake away any other debris. o Cover entire roof decking with self-adhered roofing underlayment then install synthetic or 15# asphalt impregnated felt underlayment. o Prepare roof decking to accept a ridge vent.