Specifications include, but are not limited to: Work shall consist of routine summer and winter maintenance of the Chignik Lagoon Airport facility which including preventative maintenance on Alaska Department of Transportation and Public Facilities owned maintenance equipment, building structures, and roadways located on airport property unless otherwise designated. It is the intent of this Contract that the Contractor performs all duties necessary to maintain and operate the Chignik Lagoon Airport Airport during the term of this Contract. The airport shall be kept open 7 days a week, 365 days per year unless an emergency or routine maintenance prevents the airport from being open. To the greatest extent practical, the Contractor is to provide that level of performance which will insure the safe movement and convenient use of the airport by the public. The Contractor shall conduct daily inspections of the airport. The Contractor shall keep a written list noting items that need repair, cleaning, or replacement. The list will be used for reference when the Contractor performs maintenance in accord with the terms of this contract. It should also be used as a reference when the Contractor notifies the Department representative of problems or conditions beyond the Contractor's capability to control.