ELECTRICAL SERVICE: The Contractor shall arrange the use of the existing on-site electric. WATER: Water used for construction purposes will be provided by the City at no cost. Water used for human consumption shall be kept free from contamination and shall conform to the requirements of the State and Local authorities for potable water. Water for construction purposes must be free of impurities that would be detrimental in the construction process. Page | 22 CITY OF KINGMAN FACILITIES REMODEL PROJECTS TEMPORARY LIGHTING: The Contractor shall provide temporary lighting in all work areas sufficient to maintain a lighting level during working hours not less than the lighting level required by OSHA standards. HEATING AND VENTILATION: The Contractor shall provide means for heating and ventilating all work areas as may be required to protect work from damage by freezing, high temperatures, and weather, or to provide a safe environment for workers. Heating may be by steam coils, vented or unvented direct-fired heaters, or remote heating facilities except that unvented direct-fired heaters shall not be used in any area where freshly placed concrete will be exposed to the combustion gasses, until at least two hours after it has attained its initial set. SANITARY FACILITIES: The Contractor shall provide suitable chemical toilets or water closets for the use of employees on this project. At the end of the job, such toilets shall be removed completely. ACCIDENT PREVENTION: The Contractor shall comply with all applicable provisions of MAG Section 107, with the following changes: In Paragraph 107.5, SAFETY, HEALTH AND SANITATION PROVISIONS, the words “Maricopa County” shall be deleted and the words “Mohave County” substituted. In the second paragraph, the words “or as the Engineer may determine” shall be deleted. CONSTRUCTION FACILITIES: All construction hoists, elevators, scaffolds, stages, sheeting, shoring, and similar temporary facilities shall be of ample size and capacity to adequately support and/or move the loads to which they will be subjected. All railings, enclosures, safety devices, and controls required by law or for adequate protection of life and property shall be provided. TEMPORARY ENCLOSURES: When sandblasting, spray painting, spraying of insulation, or other similar activities are in progress the work area shall be enclosed adequately to contain the dust, overspray, or other potential hazard.