The City of Phoenix is seeking a qualified contractor to provide construction services for the project listed below. This project is to alleviate reoccurring traffic congestion issues near the western end of Terminal 3 roadways. The scope of work includes, but not limited to, civil, traffic and electrical improvements such as removing the stop condition from the inner westbound curb lanes at the west end of Terminal 3 on the south side; allow for a merge condition from two inner curb lanes to one lane, and then subsequently merge this one inner lane with two outer curb lanes; modify striping on the north side of Terminal 3 at the west end to allow for two inner curb lanes entering from Sky Harbor Boulevard; add additional pavement to allow for a safer merge of the turnaround traffic with the eastbound lanes along Sky Harbor Boulevard at the Terminal 2 turnaround; install street lighting; and add fencing and bollards to maintain safety from the updated traffic patterns.