Specifications include, but are not limited to: B. Project Description and Location: Site improvements include a spreader rack system and associated concrete pad to support the system. Improvements also include utilities to be extended to the site consisting of water, sanitary sewer, natural gas, and electric service. All construction elements, as identified in the Bid Schedule, shown on the plans or details or described in the Special Provisions, are required for construction and are to include all costs associated with removals, earthwork, trenching, subgrade construction, concrete slabs, structure, lift station construction, valves, fittings, tapping sleeves, appurtenances, utility boxes, bedding, pavement replacement, hauling, placing, disposing of material, start up, testing, certifying, or any other associated work and materials required for a complete in place and operable items of construction. All work items and materials not specifically itemized in the bid schedule and that are required for the construction are to be considered incidental to the total project bid amount. 104.1.6 Site Maintenance To maintain a clean construction site, all demolished materials, to include but not limited to, asphalt pavement, concrete, rock, dirt, pipes, and so on shall be removed from the site by the end of each work shift. Stock piling of excess materials on site shall be allowed only within the treatment plant property. No separate payment shall be made for meeting these requirements.