Contractor shall furnish labor, materials, equipment, services, and specialized skills to perform work involved in the Project. The Work included in the Bid is defined in accordance with Specification No. 3849 and Plan Nos. 1-3088, 1-3093, 1-3107, 3-1580, 3-1585, 4-638, 4-641, 49-257, 50-694, and 50-695. The work generally includes: Surface grinding and placement of ARHM; surface grinding and placement of ARHM over Asphalt Rubber Aggregate Membrane (ARAM); selective removal, repair, and reconstruction of damaged curbs and gutters, sidewalks, driveways, cross gutters, alley aprons, and bus pads; modification and reconstruction of curb ramps to meet current ADA standards; adjustment of existing manholes and water meters to finished grade; removal and replacement of existing traffic striping and pavement markings; installation of new bicycle route (class III) with green shared roadway bicycle pavement markings (B-Type Sharrows); removal and replacement of sanitary sewer main line; removal and replacement of storm drain line; installation of storm drain line; construction of catch basins; construction of manhole structures; realignment of intersections; planting of new street trees; modification of existing traffic signals; installation of two drywells; as shown on the project plans and specifications, Standard Plans for Public Works Construction (SPPWC 2021 Edition), and the Standard Specifications for Public Works Construction (2021 Edition), including all supplements thereto issued prior to bid opening date.