Selective demolition and construction necessary for the Fencing Project, including associated civil and architectural work as indicated in the Drawings and Specifications. Generally, these categories of work involve new finishes, instructional areas. The Fencing Project consists of four (4) school site, contractor to field verify all measurements: A- Carrillo Elementary School B- Carver Elementary School C- Lawrence Elementary School D- Lake Intermediate School 1.2.2. A- Carrillo Elementary School 1. Provide and install approximately 1075 linear feet of 6 foot high Ameristar Montage II Genesis 2 Rail Ornamental Iron fencing. 2. Provide and install 2 each 5 foot wide by 6 foot high Ameristar Single panic gate. Reuse existing hardware. Modify as needed 3. Provide and install 3 each 10 foot wide by 6 foot high Ameristar Double panic gate. Reuse existing hardware. Modify as needed. 4. Provide and install 2 each approximately 20 foot wide by 6 foot high black vinyl chain link drive in sliding gate at the parking lot driveway with locking hardware. 5. Provide and install one each set of double sliding gate at parking lot driveway entrance with locking hardware...