Specifications include, but are not limited to: Provide a comprehensive report that summarizes in detail the existing operations of the solid waste site and provides alternatives and guidance for future site development based on changing regulations and technologies that include the following considerations: Estimated future waste generation, confirm site capacity and operating life expectancy. Estimate long term annual operating costs, closure and post closure liability costs. Summarize regulatory requirements that includes (but it not limited to) organic waste reduction. Summarize other anticipated technologies or regulatory requirements that should be considered in creating a Master Plan. Identify opportunities and challenges in the development of the solid waste site. Develop strategies to successfully plan for the future. The SP will present alternative plans based on CIP, RA and RMA analyses, and make recommendations, when appropriate. Consider the following in preparing the SP: Regulatory requirements with consideration of SB 1383 in particular. Recommendations from the CIP. Recommendations from the RA. Recommendations from the FMA. Emerging technologies. Market conditions from new regulations and competing disposal sites. Operational efficiencies. Waste diversion and disposal alternatives.