Specifications include, but are not limited to: The Owner is seeking proposals for Wide Area Network connections and will accept proposals from Service Providers for Leased Lit fiber solutions. The Respondent will include in their proposal all costs necessary to provide, construct, install, program, maintain, and monitor the services requested. All maintenance costs associated with any on-site premise equipment, provided as an integral part of the Respondent’s proposed service, shall be their sole responsibility. Per the requirement of the E-Rate Program, the services requested shall at no point now, or in the future, become the property of the Owner. The successful Respondent will include in their bid price, at a minimum, the following: 1. The first requested service is a 1Gbps Point-to-Point Fiber Ethernet circuit from the Willows High School site located at 203 N. Murdock Ave., Willows, CA 95988 to the Glen County Office of Education Willows Administration Building located at 311 S. Villa Ave., Willows, CA 95988 as noted on the Attachment “A” Site Schedule. 2. The second requested service is a Point-to-Multipoint Fiber Ethernet service between the User Network Interface (UNI) at the Owner’s “Collector Site” to the UNI(s) located at each of the sites as listed on “Attachment A – Site Schedule”. 3. The Connections shall be a minimum of 1Gbps, or higher, unless otherwise noted on the “Attachment A – Site Schedule”. 4. The physical pathway for the respondents cable infrastructure must be underground, concealed in conduit, no direct bury, to the nearest point of connection at the curb, located at the demarcation address. 5. The Respondent will provide a separate price for all one-time special construction and/or build-out costs, including but not limited to: conduit/trenching, interior pathways, cabling, terminations, construction of network facilities, route assessments, ROW access and/or easement assessments, traffic control and permits, surveys, testing, design and engineering, and project management to provide the requested service connection to the Owner’s designated demarcation point and also a separate proposal to amortize the cost of the construction into the monthly contract cost. a. If the Respondent can offer financing up to three (3) years on the Owners non-discounted share of the special construction charges, please list this in the proposal. Include the following: i. The total amount financed ii. The term of the agreement iii. The annual interest rate; The installment payment option is available for the Owner’s non-discount share of the special construction charges only, not the total cost of the special construction project.