Specifications include, but are not limited to: This project includes the demolition and abandonment of the existing dry well concrete topslab, access tube, drywell structure, demolition of mechanical and electrical equipment in the drywell, pump piping, sewer intake piping, bollards, and wetwell topslab and structure, removal and replacement of sidewalk, curb and gutter, and fences, pavement restoration, wetwell lining, installation of 3 submersible pumps, new top slab and hatch for existing wet well, precast concrete valve vault with piping, valves, and connection to existing force main, abandonment of existing forcemain and the installation of 14” DIP forcemain with couplings, elbows and connection to valve vault and existing forcemain, installation of manhole with flow meter, installation of a new diesel powered generator and fuel tank, concrete pad and security fencing, electrical equipment and controls. Bypassing of sewer flows during construction will be necessary. Traffic control and erosion and sediment control plan as noted on the plans and all incidental and appurtenant improvements and restorations specified on the Plans and herein these Special Provisions.