Mobilization/Demobilization; Traffic Control, Safety and Cleanup; Construction Staking and Monument Perpetuation; Storm Water Best Management Practices (BMPs); Unclassified Excavation and Disposal; Coldmill and Dispose of Existing Asphalt; Adjust to Grade Manhole Covers, Water Valves; Sawcut and Remove Existing and Construct Curb Ramp with Detectable Warning Surface; Sawcut and Remove Existing and Construct Concrete Curb and Gutter and Cross Gutter over CMB with AC Slot Trench; Construct AC Base Paving; Construct Rubberized AC pavement Overlay; Traffic Striping, Crosswalks, Curb Painting, Markings, and Raised Pavement Markers; Traffic Signal Loop Detectors; and all incidental work so indicated on the specifications, and required for the proposed improvements.