In accordance with plans and specifications prepared by Peterson Brustad Inc., the Work includes the furnishing of all labor, materials, tax, equipment and services for the construction and completion of a new 100,000-GAL welded steel storage tank, retaining wall, replacement raw water pump, site clearing and grading and surfacing, new site piping and appurtenances, modifications to existing piping, system hydrostatic testing and disinfection, facility commissioning, cathodic protection (CP) equipment, a baffle system for the new tank, temporary bypass pumping, water treatment plant intake piping replacement, electrical and control improvements, and demolition of the existing tank. A geotechnical evaluation of the site is also included in the scope of work.