Specifications include, but are not limited to: The Design activities and tasks shall include the following, but not limited to: a. Obtain comments to the preliminary plans and specification outlines from the City. b. Obtain NTP to start the design. c. Provide monthly updated Design Schedule in MS Project and explanation of any deviation from the baseline schedule. d. Perform additional site investigations as needed. e. Attend bi-weekly project meetings with the BOE and LASAN. Meetings to be held at 1149 S. Broadway 6th Floor, Los Angeles CA 90015 or using Google Meet. f. Prepare and conduct two (2) Design Workshops (50% and 90% design) at a location to be determined or using Google Meet. g. Obtain required plan check and Ready to Issue permits from LADBS. The BOE will assist in the process.