The Project generally consists of providing the necessary labor, equipment and materials to construct a new park facility to include baseball field and fencing, a football field with synthetic track, soccer field, and a dog park. Additional work includes demolition of existing conditions, expansion of Pahute Rd., and extension of existing sewer utility in the public Right of Way including, but not necessarily limited to, the following:
- Grading and Drainage.
- Sewer, Water and Storm Drainage.
- Asphalt Parking area with Concrete Curbs and Drive Aprons
- Concrete Paving
- Chain Link Fencing
- Play Equipment Surfacing
- Picnic Shelters
- Coordination of installation of a prefabricated building
- Sports Lighting
- Site Lighting
- Spectator Seating
- Irrigation
- Planting
The Work specifically includes all work as represented by the Drawings and Specifications issued for construction and subsequent approved revisions and addenda and all additional work as directed by the Director of Municipal Services, the Town Engineer, or their designee(s). Work on the Project shall be completed within 310 calendar days. The anticipated award date is October 8, 2024, and a groundbreaking ceremony will be held on October 9, 2024. The awarded Contractor will be required to attend the groundbreaking ceremony.