Summary of Specifications:
Project Description: 1. East Jefferson Avenue from Colorado Blvd west to Monroe Street. Roto-mill and pave. Roto-mill both north and south shoulders (10’ x 2,700’) of Jefferson Ave. (2 inch depth), removing approximately 3,000 square yards of existing asphalt. Pave Jefferson Ave. (30’ x 1,350’) at 2.5 inches in depth, approximately 612 tons.
2. Monroe Street. Finish paving northeast shoulder, roto-mill and pave. Roto-mill recycled asphalt shoulder (10’ x 320’) at 4” inches depth, approximately 355 square yards. Pave shoulder at 5 inches depth, compacted to 4 inches, approximately 97 tons.
The contractor will need to provide all traffic control (flaggers, signage, cones, barrels, etc.) throughout the entire project. The City of Cherry Hills Village does not recognize traffic control or mobilization as a separate line item. This project will be scheduled after the completion of the new curb and gutter installations on the north side of East Jefferson Avenue and the east side of Monroe Street. Concrete installations to be scheduled March, April, or May, 2016.
There will be a NO WORK performed from August 1, 2016 to September 6, 2016. Please see Form of Bid : Summary of Work Descript ion.