The City of Englewood’s objective is to hire a qualified and competent Contractor to provide all labor, materials, traffic control, and equipment necessary to construct the Sidewalk and Ramp Gap Design and other improvements as detailed in the attached drawings and specifications included as part of this Invitation to Bid.
General Scope of Work Description
The work to be performed under this contract for Sidewalk and Ramp Gap Construction includes the addition of approximately 750 linear feet of 6” sidewalk to connect the existing gap in sidewalk on the north side of W. Union Avenue, west of S. Santa Fe Drive, to the access for Creekside Experience Park, which is referred to as Package 1. Package 1 will also include repairing deteriorated drivecuts along W. Union Avenue, the relocation of a fire hydrant, construction of 6” to 2’ retaining walls to accommodate the newly constructed sidewalk, and construction of an ADA ramp. Package 2, which includes the addition of approximately 500 linear feet of 6” sidewalk to connect the sidewalk access at the Little Dry Creek Trail to the parking lot at W. Floyd Avenue and S. Inca Street. Package 2 will also include the construction of an ADA ramp. Mobilization, construction surveying, and traffic control shall also be provided by The Contractor for the project.