The City of Greeley has received $2,375,653 Congestion Mitigation and Air Quality (CMAQ) grant to expand the existing communication system fiber optic ring. This expansion, referred to as Phase 3, includes conduit, handholes, fiber, and new adaptive traffic signal controls in the southwest sector of City of Greeley. Approximately 7.8 miles of fiber will be installed as part of the Phase 3 project, with 3.8 miles along state route US 34. As part of this project, Greeley will install new adaptive signal controls at three signalized intersections. All work shall be subject to CDOT oversight, review, and approval. This project must comply with all CDOT and/or FHWA requirements. The City of Greeley has received $2,375,653 Congestion Mitigation and Air Quality (CMAQ) grant to expand the existing communication system fiber optic ring. This expansion, referred to as Phase 3, includes conduit, handholes, fiber, and new adaptive traffic signal controls in the southwest sector of City of Greeley. Approximately 7.8 miles of fiber will be installed as part of the Phase 3 project, with 3.8 miles along state route US 34. As part of this project, Greeley will install new adaptive signal controls at three signalized intersections. All work shall be subject to CDOT oversight, review, and approval. This project must comply with all CDOT and/or FHWA requirements.