This project involves public notification, traffic control, preparation and installation of crack treatments for:
7 Streets in North Pasture, 72585 SY, 17,421 lb sealant
Materials used for crack treatments shall be per the technical specifications contained in the project manual. All cracks including the asphalt to curb and gutter transition shall be cleaned and treated per the project maps. If all cracks on the project map have been treated and there is crack sealant materials remaining crack sealing will continue in same project area until all crack sealant materials have been used. If all cracks on the project have been treated and there is mastic materials remaining, the remaining mastic shall be returned to owner at material cost plus 15%.
Traffic Control shall be a mobile one lane configuration where the flagger in the back of the operation remains far enough behind the placement of crack sealing to ensure temperatures are adequate for live traffic. A minimum of two flaggers shall be required at all intersections and blind corners.
Payment will be made per lb. which shall include all traffic control, mobilization, demobilization, materials, and equipment. All costs incidental to the preparation of the surface prior to application of the hot poured joint and crack sealant will not be paid for separately, but shall be included in the work.