Separate sealed bids for Bayou Gulch Road (Pradera Parkway to Scott Avenue) Project will be received by the Owner, Douglas County Government, Department of Public Works Engineering, Philip S. Miller Building, 100 Third Street, Suite 220, Castle Rock, CO 80104, until Tuesday, May 9, 2023, at 2:00 p.m. This project consists of improvements to Bayou Gulch Road from Pradera Parkway to Scott Avenue. The improved configuration will include realignment and reconstruction of a single driving lane with shoulders in each northbound and southbound directions, construction of an embankment, extension of a concrete box culvert and a new urban storm sewer system. Bid items include removal of sidewalk, asphalt and curb and gutter, hot mix asphalt, soil retention blanket, trench drain, extension of box culvert, installation of storm water system, and traffic control.
The Contract Documents will be available after 10:00 a.m. on Monday, April 17, 2023, through Rocky Mountain E-Purchasing System Website (www.rockymountainbidsystem.com) or they may be obtained at the above address. Electronic versions of the Plans obtained by any other means than as described above may not be complete or accurate, and it is the Bidder’s responsibility to obtain a complete set of the Project Plans and Specifications. Douglas County will not be held responsible for misinformation received from private plan rooms.
A pre-bid conference will be held at 10:00 a.m. on Tuesday, April 25, 2023, at the Department of Public Works Engineering, Philip S. Miller Building, 100 Third Street, Suite 220, Castle Rock, CO 80104. All questions are due to Benjamin Pierce P.E., Project Engineer by 12:00 p.m. on Tuesday, May 2, 2023. The Bid Opening will be conducted at 2:00 p.m. on Tuesday, May 9, 2023, at the same address.
The Project includes the following major items and approximate quantities:
- 90,290 cubic yards embankment replacement
- 3391 tons hot mix asphalt
- 1707 linear feet reinforced concrete pipe (complete in place)
- 5114 linear feet curb and gutter
- 810 square yards concrete sidewalk
Prior to submitting a Bid Proposal, Bidders shall have received prequalification status (active status) with the Colorado Department of Transportation to bid on individual projects of the size and kind of work as set forth herein.
Any questions on the bidding process shall be directed to Benjamin Pierce P.E., Project Engineer at 303.660.7490.
Plan holder information, can be found on the Rocky Mountain E-Purchasing System Website.
NEWS-PRESS
First Publication: April 13, 2023
Account Number: 2734