This project generally includes the the purchase and installation of the following: approximately 7,000 lf of 18” PVC water pipe, numerous gate valves, and a 9’ by 16’ underground concrete vault. Included within the vault is miscellaneous DIP piping, Endress Hauser flow meter, CLA-VAL flow control valve, miscellaneous gauges, butterfly valves, taps, pipe supports and restraints, venting materials and other.
Much of the pipeline will be installed within the Meridian Golf Club and specific attention will need to be payed towards minimizing the disturbed area and restoring the site to pre-existing conditions so that the Golf Course's level of service is not impacted in the future.
Please defer to the Attached Bid Documents for all schedule, proposal and submission requirements.
The Pre-Bid Meeting is recommended to review the project area and discuss project logistics, which will support the prospective bidder's ability to provide a complete bid. It will be held on Friday, December 2, 2022 at the Main Office of the Meridian Metropolitan District:
12111 E. Belford Ave.
Englewood, CO 80112
Interested parties should enter at the main entrance and ask for Michael Assante and Troy Nedved in regards to this project.