General Description - The work to be performed under this contract includes removal and replacement of existing concrete including crosspan, sidewalk, curb and gutter, curb ramps. Perform full depth reclamation, and various thicknesses of asphalt paving within the street(s) listed in the Appendices or as directed by the Project Manager. The Contractor shall supply all labor, equipment, and materials necessary to complete the work in accordance with these specifications. The contract shall be awarded based on bids received for Bid Schedules A&B, and the contract documents. However, competitive bids shall be submitted for Bid Schedules ‘C’ through ‘K’ in order to be considered for award. Work on Gilbert Street shall begin May 31, and immediately followed by Wolfenberger Road to avoid school traffic issues. Night work shall be required and entail asphalt patching, asphalt milling, and asphalt overlay on Wolfensberger Road, between the I-25 Bridge and Kinner Street. Contractor will be required to coordinate construction activities with adjacent businesses, trash removal companies, school district, HOA, Metro Districts, and other Town maintenance projects if applicable. Contractor shall acquire all Town of Castle Rock and State of Colorado stormwater permits as applicable, approved TESC plans will be provided after notice of award is issued. The contractor shall commence work no later than three (3) calendar days from, and including, the date of the Notice to Proceed, and be construction complete (punchlist items, cleanup, and demobilize) within one hundred and twenty days (120) working days from the date on the Notice to Proceed for Bid Schedules A&B only. If “Construction Completion” is not issued within the allotted contract time for the original scope of work, “Liquidated Damages” shall be assessed. When contract work is complete, the contractor shall commence work on punchlist items, cleanup, and demobilizing regardless of contract time remaining. Work shall take place between April 11, 2022 and September 28, 2022. A schedule of sequencing of all work shall be submitted at or before the project pre-construction meeting, and approved by the Town prior to issuance of Notice to Proceed.