The Town of Lyons is inviting proposals from highly qualified ‘Teams’ to provide final design and bid services for flood recovery efforts for Lyons Valley River Park (previously referred as the McConnell Pond area), which was damaged as a result of the September 2013 flood. Design teams will focus on the final detail design to include final construction documents, drawings and specifications for the construction of Lyons Valley River Park based on the 30% preferred alternate plan recently completed as part of the Lyons Parks Flood Recovery Planning Process. The final design will address goals and priorities associated with the Parks Flood Recovery Planning Process, FEMA Project Worksheets and Project Scopes, the Lyons Recovery Action Plan (LRAP), associated Program Development Guides (PDG’s), existing Town master plans, comprehensive plans and other relevant documentation and studies. Teams will assist the Town of Lyons through the bidding process and with associated construction administration related to the design as required.