Construction of approximately 2,500 feet of an addition to an existing collector roadway for the widening of Stroh Road from the J Morgan Boulevard intersection, crossing Cherry Creek to the Motsenbocker/Crowfoot Valley Road intersection plus reconstruction of approximately 2,500 feet of Stroh Road in the same area. Construction also includes the extension of J Morgan Boulevard to the South approximately 500 feet. Included with this roadway construction, but not limited to, will be an approximate 300-foot long, 3-span bridge (2-lanes), approximately 4,000 tons of stone matrix asphalt, approximately 1,000 cubic yards of concrete paving, approximately 10,000 tons of hot mix asphalt paving, storm sewer drainage (culvert, drainage swale and sand filters) improvements with associated inlets/manholes, upgrades to one (1) traffic signal, installation of one (1) traffic signal, waterline installation, sanitary line installation, earthwork, aggregate base course, geogrid, concrete flatwork, signage, pavement markings, traffic control and seeding/mulching work.