The Upper Thompson Sanitation District (Owner) is hosting an Industry Day for introduction of the WRF and Lift Station Improvements Project (Project) to general and sub-contractors in order to gather feedback on interest, schedule, prequalification, and availability. The Project will upgrade the District’s wastewater infrastructure asset base to meet regulatory requirements and maintain efficiencies in serving the greater Estes Park community. The Project design is 90% complete and Bid packages are anticipated to be released in late summer / fall of 2024.
Information regarding the Project will be provided only to attendees. There are no limitations on number of staff from general and sub-contractors who are permitted to attend. Staff from the Owner and key design staff will be available to discuss critical elements of the work. Civil, electrical, mechanical, masonry, reinforced concrete, dewatering, and instrumentation and controls subcontractors and Certified Disadvantaged Business Enterprises (DBE) are encouraged to attend.
Attendance is not a prerequisite for future bidding.
At the completion of the Industry Day the Owner will incorporate feedback as appropriate and advise contractors of next steps for bidding the Project using up to five (5) bid packages.
Information regarding the Industry Day is located at www.BidNetDirect.com
The Industry Day will be held on April 24, 2024 between 10 am and 1 pm. A Project overview will be provided at 10 am followed by smaller group breakout sessions to discuss discrete Project elements.
The Industry Day will be at Merrick & Company’s Greenwood Village office, 5970 Greenwood Plaza Boulevard, Greenwood Village, CO 80111. Contact Morgan Molesworth with questions regarding attendance at morgan.molesworth@merrick.com or (720) 330-3212.
The Project will include construction of the following four (4) project elements released as separate bid packages:
- 2 MGD Wastewater Reclamation Facility (WRF) including headworks, biological nutrient removal basins, membrane biological reactors (MBR), membrane treatment building (MTB), ultraviolet (UV) disinfection, solids storage and dewatering facilities, administration building area, and maintenance building. The project includes installation of District procured membranes, equipment, and appurtenances. The WRF may bid as two separate packages.
- Wapiti Lift Station (WLS) including structures, pumps, piping, and appurtenances.
- WLS Force Main including crossing of the Big Thompson River.
- Fish Creek Lift Station (FCLS) including structures, pumps, piping, and appurtenances.
The District appreciates your interest in Industry Day.
Upper Thompson Sanitation District
Chris Bieker, District Manager
chris@utsd.org