• The demolition and removal of the entire one-story masonry building and specific associated site features. • The entire building, including foundations, footings, slabs, underground utilities and contaminated soils will be removed, and legally disposed of. • Excavations from foundation removals, underground utility removals and contaminated soil removals will be backfilled with clean imported/controlled fill. • Site features will be demolished, with some remaining. The Town will advise on what site features will remain. All work shown on the Demolition Plan, Abatement Plan, Utility Plan and Final Site Plan is included. • The site will be accessed and stabilized in accordance with Inland Wetlands regulations. • All existing utilities will be terminated at the property lines and abandoned per Town regulations including but not limited to electric, gas, sewer, water, storm, and Tel/Com. • Erosion controls and temporary construction fencing will be installed, maintained and removed as required. • Hazardous material abatement is included in the scope of work. Specifications will be provided by TRC and incorporated into CWA’s bid documents. • Any and all coordination with TRC for testing and monitoring as required is included. • Existing fire hydrants/fire hydrant connections will be used for the supply of water required during demolition, including but not limited to wash down and dust control. • The Town of East Hartford will obtain all necessary municipal/Inland Wetland approvals and waive any permit fees required for work directly or indirectly associated with the abatement and demolition of the structure.