The Railroad Square Revitalization Project, scope includes the extension of the Sue Grossman Greenway from Water Street to 160 Church Street, including road, sidewalk, and crossing improvements along John Street, and the installation of 10 ft wide trail on John and Mason Street; construction of a new pedestrian promenade at 136 Water Street, creating a public walkway between the train station, greenway, parking, and community amenities, which will include green spaces, lighting, seating, and way-finding signage; and redevelopment of John Street including conversion to a one-way street with new granite curbing and sidewalks; as well as partial-depth reconstruction of Mason and Church Streets with new granite curbing, sidewalks, lighting, and minor drainage improvements; mill and overlay of Water Street with new sidewalks, paver amenity strip, bump outs, lighting, and minor drainage improvements; and a new parking lot and pocket park at Torrington Christmas Village and is designated AS “RAILROAD SQUARE REVITALIZATION PROJECT” for the City of Torrington.