Specifications include, but are not limited to: Design Phase Commissioning: A. Owners Project Requirements: Review the Owners Project Requirements Document • Review the Basis of Design Document for coordination of the OPR. B. Design Meetings – 6ea remote meetings included as required (Virtual) C. Commissioning Plan: Development of the Commissioning Plan D. Commissioning Specification: Development of Commissioning Specifications for inclusion into the project manual. Provision of specs during Design Development stage. E. Design Reviews: Perform a design review with comments as it pertains to commissioning provided at the following stages: • 100% Design Development (1 Submission) • 100% Construction Documents (1 Submission) Bid Phase Commissioning: A. Questions: Respond to Questions from bidders regarding Commissioning Construction Phase A. Project Management: Coordinate, organize and direct commissioning activities in a logical and efficient manner. Phone calls, email correspondence, in-person and virtual meetings as indicated below fall under this task. B. Submittal Reviews: Review select Mechanical and Electrical Submittals (only larger equipment submittals for M/E shall be reviewed for compliance with Commissioning Plan and Spec. • The Cx Agent does not approve submittals but rather reviews for familiarity and in development of checklists and functional test sheets. C. Review of Controls: Review select the controls shop drawings, sequence of operations, and control logic. The review will familiarize the CxA with the control logic and specific types of instruments that the contractor will use to meet the design criteria. • The CxA will review the lines of software code that the contractor is intending to use in the Building Management System. • The CxA will confirm and review the integration of the Building Management System with other systems such as, fire alarm, security, etc