Specifications include, but are not limited to: Description of the Work: The scope of work includes the construction of sidewalks, ADA accessible ramps, driveway and curb installations, and repairs at various locations throughout the Town of Stonington. Sites are yet to be determined. The nature of the repairs will be raising, lowering, removing and replacing existing slabs and new construction. The Town will attempt to parcel the work in lots, by street, in order to minimize the inconvenience to the successful bidder. All work done under these specifications is to be accomplished in accordance with these specifications, the Town of Stonington Technical Standards for Development and Roadway Construction, the State of Connecticut Department of Transportation’s Standard Specifications for Roads, Bridges, and Incidental Construction, Form 818 dated 2020, as amended, plus any supplemental specifications thereto of the latest date posted on the State of Connecticut Department of Transportation’s website (if a conflict exists with the Town’s specifications, the Town’s specifications shall govern). The Work is expected to exceed $100,000 and will require State of Connecticut Prevailing Wage Rates for all on-site labor. A. The Contractor shall be prepared to start work within the specified time and have adequate labor, materials, and equipment available to dedicate to this project to insure completion within the specified time frame. B. Contract limit lines for all work are one foot beyond the edge of walk unless otherwise identified by the Director of Public Works or their designated agent. Any areas disturbed outside this area by the Contractor are the responsibility of the Contractor.