Specifications include, but are not limited to: . The Project includes full design and construction services for a new Recreation Facility. The Design-Builder shall design and construct an all-inclusive building to best execute the DPR programmatic needs. In general, the Design-Builder will be required to program, fully design and construct an all-inclusive recreation center by modernizing the existing Upshur Recreation Center or demolishing the existing center and constructing a new all-inclusive Upshur Recreation Center and associated park or a combination of both whichsoever is most advantageous to DPR and the district and can be accomplished within the approved project budget based on the 100% finalized Design Development documents. The programming, design, construction, modification, revitalization, and renovations will include but are not limited to the recreation center, overall Project landscaping, site furnishings, amenities, signage, hardscaping, and all improvements to comply with American Disabilities Act. Without limiting the generality of foregoing, the DesignBuilder shall be required to provide all management, personnel, design services, labor, materials, and equipment necessary to complete the Project. All work shall be code compliant and installed per DGS and DPR standards, specifications, manufacturer recommendations and applicable industry standards (collectively, the “Project”).