Summary of Specifications:
INVITATION TO BID NO. 67-02/03
NOTICE TO CONTRACTORS
Sealed bids will be received by the City of Miami Beach Procurement Director, 3rd Floor, 1700 Convention Center Drive, Miami Beach, Florida 33139, until 3:00 p.m. on the 30th day of September 2003 for:
CONCRETE RESTORATION AND REPAIRS TO THE CITY OF MIAMI BEACH 17TH STREET PARKING GARAGE
At the time, date, and place indicated above, bids will be publicly opened. Any bids or proposals received after time and date specified will be returned to the bidder unopened. The responsibility for submitting a bid/proposal before the stated time and date is solely and strictly the responsibility of the bidder/proposer. The city is not responsible for delays caused by mail, courier service, including U.S. Mail, or any other occurrence.
Scope of Work: The work specified in this bid consists of furnishing all materials, labor, equipment, supervision, mobilization, overhead & profit required to provide concrete restoration and repairs to the 17th Street Parking Garage. There will be 3 different types of repairs: • Cracks in beams: Repairs to small cracks generally in the mid-span of the joists at all levels of the garage. All of these cracks need to be repaired as per the manufacturer recommendations (Sika or equal). • Spalling repairs: Repairs are needed throughout the parking facility. Spalls and poorly repaired concrete areas require properly repaired sections of concrete. A proper repair requires removal of existing concrete, cleaning of corroded reinforcing steel, and replacement with a Polymer modified cementitious patching material selected to be compatible with the surrounding concrete and with it’s intended use or exposure. • Waterproofing: Waterproofing is needed on the storage room, roof level, located on the west area of the parking garage. The waterproofing has lost its integrity and needs to be repaired.
Estimated Construction Budget: $300,000
Minimum Requirements: Prospective Bidders must have five (5) years minimum experience as a licensed General Contractor, and must have completed at least three (3) projects within the last five (5) years associated with Sikatop 123 and Sikatop 122 or equal products for spalling repairs and Sikadur 51 NS/SL or equal for epoxy installations and be certified for the installations of the product by the manufacturer. Contractor must provide reference of at least 3 separate projects where the installation of such products has been successfully installed with a total project value of $100,000.00 or greater.
A Non-Mandatory Pre-Bid Conference will be held at 10:00 a.m. on September 17, 2003 at the City of Miami Beach City Hall, First Floor Conference Room, located at 1700 Convention Center Drive, Miami Beach, FL 33139.