The proposed new roadway geometry will be a six-lane urban divided arterial with on-street bike lanes, a sidewalk on the west side of the roadway and a 10-foot pathway east of the CR-951 canal. The proposed work for Collier III includes but not limited to the following: - Alignment Shift (Start just S of 25th Ave. SW to the south) - Traffic Signal update (Golden Gate Parkway) - Two (2) New Traffic Signals (20th Place SW and 27th Avenue SW) - Bus Stop Relocation (Bus Stop 276 (Northbound) from proximity of 17th Ave SW to across from 20th PL SW.) - Canal Relocation (830’ N of 23rd Ave SW to 520’ S of 27th Ave. SW – Approximately 3,800’) - Bridge Reconstruction (Over Golden Gate Main Canal) - New Bridge Construction (27th Avenue SW) - Bridge Removal (25th Avenue)