(Contractor must obtain and submit all permits prior to performing any work). A. Work under this Contract includes the remodeling of certain restrooms facilities within the UHealth | Jackson, Palmetto and Tri-Rail Metrorail stations. Scope is identified in the construction documents and associated specifications for each of the facilities; however, it includes and is not limited to: 1) The removal and installation of all fixtures and finishes complying with codes and ADA standards. 2) Removal and replacement of all finishes and fixtures with new walls, floor, and ceiling coverings, fixtures, appurtenances, plumbing, electrical, mechanical, communications, P/A speaker and speaker grills, hand free telephones, building systems, equipment and components associated thereto for the complete repair of the Metrorail Bathroom projects. 3) Remove and replace with new cast-iron and copper all existing sanitary drains, waste and vent systems. 4) Remove and completely re-pipe with new L-type copper all existing water pipe, including trap primers, control valves, and supports for all plumbing fixtures. 5) Provide new plumbing fixtures “institutional type” ADA and Watersense compliant. Contractors are to verify that the specified products, in the construction documents, are Watersense compliant. Contractors are to provide cut sheets for approval of all plumbing fixtures. In the event that some plumbing fixtures, as specified, are not watersense compliant, contractor is to submit to DTPW substitutions of equal or greater performance with the appropriate watersense certifications. 6) Provide to all new plumbing fixtures acorn duran-ware 16-gauge, type 304 stainless steel rated for 1000 lbs. with all mounting screws concealed. 7) Restrooms shall be equipped with as required per DTPW toilet accessory specifications. 8) All bathroom’s walls shall be tile from floor to ceiling with ceramic tile: Daletile, Marrazzi & American Olean, Ice White 0025, Glossy with Epoxy integral color grout, color: 44 Bright white. 9) Bathroom floors shall be anti-slip ceramic tile. Daletile: Marrazzi & American Olean, Story Floor 0034, Matte Balance with epoxy integral grout: laticrete epoxy grouts, 78 sterling Silver. 10) Provide new mechanical soffit and rigid ceiling with fire alarm and lighting.