Specifications include, but are not limited to: replacement or initial installation of 272 new water meters, 272 new water meter transceivers, signal repeaters (as required) and a system gateway. The installation includes the removal of the existing system currently installed. The contractor shall be responsible for disposal of existing materials at a location allowable by law. Contractor shall clean up debris and materials on a daily basis and dispose of at a location allowable by law. Any damages to property shall be the responsibility of the contractor and property shall be restored to its original state. Contractor shall not start an area that cannot be finished in the same day. Work area to be roped off and kept secure from the public and/or tenants. 2) It is the preference of the HACFM that the sub-metering system be an integrally designed system with all devices provided by a singular manufacturer. The intent of this requirement is to limit the number of parties who may become involved in any maintenance, operation, or warranty issue. If a vendor/manufacturer/installer desires to use multiple components to provide an operational system a statement and description of how any operational, maintenance/warranty item will be handled by a single point of responsibility.