2. SCOPE OF WORK A. CONTRACTOR shall conduct mandated AHERA inspections of thirty-six (36) FSDB buildings, covered walkways and shelters by an AHERA-accredited asbestos building inspector, as required by the multiple regulations contained in various paragraphs of 40 CFR §763, once every three (3) years for compliance. B. CONTRACTOR will conduct periodic surveillance, at least once every six months, in accordance with FSDB’s management plan and in accordance with 40 CFR §763.92(b). CONTRACTOR will supply FSDB with reports from the surveillance inspection and in accordance with 40 CFR §763.92(b). C. CONTRACTOR shall construct a management plan based on information collected from inspections and previous reports within 30 days of the inspection and supply a copy to FSDB. Existing management plan is to be updated after the three-year inspection has been completed. D. During assessments, any suspect material is to be collected according to sampling procedures in 40 CFR §763.85 for laboratory analysis with FSDB approval. If FSDB needs, CONTRACTOR will compile recommendations for response actions in accordance with 40 CFR §763.90. E. CONTRACTOR shall perform pre-construction demo surveys for asbestos-containing material/lead-based paint as needed. F. CONTRACTOR shall perform air quality sampling as needed. G. CONTRACTOR shall perform mold sampling as needed. H. CONTRACTOR shall supply FSDB with reports from any inspections, survey, and sampling completed and in accordance with 40 CFR §763.92(b).