Specifications include, but are not limited to: providing all labor, materials, equipment, tools, transportation, services and incidentals to perform all work necessary for the removal, replacement, and installation of two fuel tanks, at Crystal River airport. This includes, but is not limited to, removal and replacement of two 12,000 gallon aviation fuel tanks, two sump recovery tanks, pumps, filters, piping (relocating existing and new), hoses, reels, coatings, painting, concrete sealing and repairs, electrical lighting power, Emergency Fuel Shut-Off (EFSO), Scully system, galvanized steel catwalk, electrical generator system included transfer switch and enlarged platform, utility rack with lighting controls and panels, remote fueling cabinet, card reader, asphalt patching, and other work incidental to the completion of this project.