Specifications include, but are not limited to: Demolition and removal of 169 linear feet (LF) of 18” Corrugated Metal Pipe (CMP), 2,136 LF of 24” CMP, 469 LF of 30” CMP, 672 LF of 42” CMP, and 25 LF of 48” CMP. The Project also includes the installation of 169 LF of 18” RCP, 2,136 LF of 24” RCP, 469 LF of 30” RCP, 672 LF of 42” RCP, and 25 LF of 48” RCP, two headwalls, associated asphalt and curb and gutter restoration, and also landscaping and grading and erosion control devices associated with the installation of these items. The work will be performed in Douglas County in the Holly Springs Subdivision by open cut methods as required and shown on the plans and specifications for the Holly Springs Subdivision Storm Pipe Replacement Project, prepared by Rindt-McDuff Associates, Inc., Tim Burroughs, P.E., dated 04/19/2019.