Specifications include, but are not limited to: Remove all roof covering material down to roof sheathing or furring strips. Remove all debris to legal dump site. Take precautions to protect plants, shrubs, trees and fences from damage during removal. Replace up to 40% of any rotten, badly warped or broken roof decking and fasteners. Materials shall match remaining material as closely as possible. Call Program Administrator for compliance inspection. Install 15 lb.asphalt saturated felt and new 220 lb.or heavier Class Athree-tab fiberglass self-sealing strip shingles on top of roof decking using 8 nails per shingle. Install starter course at edges of roof. Shingles to have a 20-yearlimited manufacturer’s warranty. Install metal flashing tucked behind siding at intersections of roof and walls. Install galvanized metal flashing tucked securely and at least ½” into masonry units of chimneys. Program Administrator will select color nstall continuous metal ridge vent along ridge lines of roof. Stop vents 18” from end of ridge line or from intersections of ridge lines. Make sure decking at ridge line is cut back at least 1” from edge of ridge pole so that the attic can ventilate.