1. Mobilization (Not to exceed 6% of total sum bid, excluding bid price for mobilization, allowances and allowable cost items. The cost for demobilization shall be considered incidental to the mobilization cost). Lump Sum $___________ 2. Pre and post-construction surveys, grades, lines and levels, including labor, materials, equipment and incidentals as required. Lump Sum $___________ 3. Temporary facilities including, but not limited to, field office, project sign(s), temporary utilities, staging areas, protection of elevator(s), protection of existing construction, safety signage, barricades, fencing, etc. and all other incidentals in place complete. Lump Sum $___________ 4. Hazardous materials removal including, but not limited to, testing, all labor, project monitoring, air monitoring, hauling, disposal, materials, equipment and incidentals as required to complete the work. Lump Sum $___________ 5. Select Demolition – Demolition of existing partitions, doors, carpeting, FF&E, existing electrical panels, receptacles, telecom cabling, conduits, wires, cables, conductors, drinking fountain, including, but not limited to, all labor, hauling, disposal, materials, equipment and incidentals required to complete the work.