a. Contractor will submit the required State of Illinois NESHAP demolition notification in accordance with State regulations. In addition, the Contractor shall obtain a Village of Algonquin demolition permit. The permit fee for the Village demolition permit shall be waived for this project. b. Contractor will provide a 6-foot-tall temporary construction fence for security around the perimeter of the building during removals. The fence must be maintained to the satisfaction of the Village at no additional cost to the contract. c. Contractor will demolish 1(one) story commercial building. d. Contractor will remove existing slab on grade and foundations systems 1’ below surrounding elevation. Basement slab will be cracked for drainage and foundations will be removed 1’ below final grade. e. All concrete will be hauled to a recycling facility generated from the removals. f. Contractor shall fill basement with granular fill in 8-inch lifts and cap with 1-foot of CA-6. All lifts to be compacted to Village standards. CA-6 material shall be from a virgin source (with documentation from provided confirming such) or meet IEPA TACO Tier I soil remediation objectives as provided in 35 IAC 742 for the target compound list parameters. Documentation regarding the source and analytical results (as applicable) shall be provided to the Village for review and approval prior to import. Contractor assumes basement is up to 9-feet tall. g. Contractor shall take title to all salvage derived from the removal work. h. Contractor will remove, haul, and legally dispose of all combustible material and metallic debris to an off- site location...