Parking and roadway striping work shall include the following: 1) Repainting of striping, parking symbols and traffic control symbols on all areas of paving as indicated. a) No materials shall be applied to apply to dusty or dirty surfaces. Prior to applying any materials, the Contractor Shall clean the surface by removing vegetation, loose materials, dirt, mud and other objectionable materials. b) Complete parking areas including gutters at all Lake Land College locations are to be swept with a power broom vehicle prior to sealing or striping. c) When sweeping work is complete, no visible debris should remain, and no ridges, trails or piles of debris, leaves, gravel, soil or sand shall be left by the sweeper. d) If normal sweeping methods do not remove dust, the surface shall be flushed with water incidental to this bid item. e) If water is taken from city hydrants, the Contractor must contact the Public Works Water Department for a hydrant meter to be installed prior to any water usage. The water usage and meter installation is charged directly to the Contractor. The Contractor must supply their own hookup to the meter and hose.