The Project consists of the bridge deck overlay and preventive maintenance of Bridge No. 301, Main Street over ITR, including but not limited to milling and overlaying the bridge deck, partial and full depth patching to the concrete deck, surface sealing the existing bridge railings and copings, cleaning and painting structural steel and bearing assemblies, filling voids under slope walls with flowable fill, replacing the reinforced concrete bridge approach slabs (RCBAs) and railing transitions, replacing portions of the damaged bridge rail and transitions, replacing the bridge deck longitudinal expansion joint seals, adding decorative signage on the bridge, replacing damaged bridge deck drain system, concrete approach work, maintenance of traffic and replacing the Type I-A joints.