Specifications include, but are not limited to: The 2024 PCC Street Patching Program project includes the full depth removal and replacement of PCC street pavement at three (3) separate locations, generally located on: Site 1 – NW 4th Street and NW Arlan Drive intersection (7” pavement), Site 2 – SW Prairie Trail Parkway and SW Abilene Road intersection (8” pavement), and Site 3 – NW State Street between West First Street and NW Prairie Ridge Drive (9” patches) The construction improvements include approximately 1,850 SY of 9” thick PCC Class C-SUD full depth patches, 550 SY of 8” thick PCC Class C-SUD street pavement, 1,275 SY of 7” thick PCC Class C-SUD street pavement, 400 SY of 7” thick PCC Class C-SUD fully reinforced street pavement, 300 LF of storm sewer, and 275 LF of water main. Other associated improvements include sidewalk and pedestrian ramp removal and replacement, installation of new intake structures, minor adjustments to sanitary and storm sewer structures, partial rebuild of an existing intake, temporary traffic control, maintenance of postal service and solid waste collection, temporary surface restoration, mobilization, and miscellaneous associated work necessary to complete the project. A truss screed shall be utilized on all patches greater than or equal to three panels in length.