1 * TOPSOIL, OFFSITE CY 4.00 $___________ $_____________ 2 * EXCAVATION, CLASS 10 WASTE CY 8.00 $___________ $_____________ 3 CURB & GUTTER REMOVAL AND REPLACEMENT SY 75.00 $___________ $_____________ 4 * REMOVAL OF SIDEWALK SY 43.50 $___________ $_____________ 5 * REMOVAL OF DRIVEWAY SY 7.10 $___________ $_____________ 6 SIDEWALK, PCC, 4 IN. SY 49.00 $___________ $_____________ 7 SIDEWALK, PCC, 6 IN. SY 22.00 $___________ $_____________ 8 DETECTABLE WARNING SF 48.00 $___________ $_____________ 9 DRIVEWAY, PCC, 8 IN. SY 3.60 $___________ $_____________ 10 TRAFFIC SIGNALIZATION LS 1.00 $___________ $_____________ 11 PAINTED PAVEMENT MARKINGS, DURABLE EPOXY STA 17.76 $___________ $_____________ 12 * PAVEMENT MARKINGS REMOVED STA 6.30 $___________ $_____________ 13 * GROOVES CUT FOR PAVEMENT MARKINGS STA 17.76 $___________ $_____________ 14 * TRAFFIC CONTROL LS 1.00 $___________ $_____________ 15 * HYDRAULIC SEEDING, SEEDING, FERTILIZING, AND MULCHING, TYPE 4 (URBAN TEMPORARY EROSION CONTROL MIXTURE) AC 0.04 $___________ $_____________ 16 * SOD SQ 8.00 $___________ $_____________ 17 * FILTER SOCK, 6 IN. LF 200.00 $___________ $_____________ 18 * FILTER SOCK, REMOVAL LF 200.00 $___________ $_____________ 19 * TREE PROTECTION FENCE LF 100.00 $___________ $_____________ 20 * CONSTRUCTION SURVEY LS 1.00 $___________ $_____________ 21 * MOBILIZATION LS 1.00 $___________ $_____________ 22 * CONCRETE WASHOUT LS 1.00 $___________ $_____________ 23 * UNIFORMED POLICE OFFICERS DAY 16.00 $550.00 $8,800.00