0010 2104-2710020 EXCAVATION, CLASS 10, CHANNEL CY 779.000 _________._____ _________._____ 0020 2401-6745625 REMOVAL OF EXISTING BRIDGE LUMP SUM LUMP SUM _________._____ 0030 2402-2720000 EXCAVATION, CLASS 20 CY 117.000 _________._____ _________._____ 0040 2403-0100010 STRUCTURAL CONCRETE (BRIDGE) CY 34.100 _________._____ _________._____ 0050 2404-7775005 REINFORCING STEEL, EPOXY COATED LB 81,770.000 _________._____ _________._____ 0060 2404-7775009 REINFORCING STEEL, STAINLESS STEEL LB 8,437.000 _________._____ _________._____ 0070 2414-6424110 CONCRETE BARRIER RAILING LF 242.000 _________._____ _________._____ 0080 2501-0201042 PILES, STEEL, HP 10 X 42 LF 980.000 _________._____ _________._____ 0090 2501-0201253 PILES, STEEL, HP 12 X 53 LF 1,820.000 _________._____ _________._____ 0100 2501-5478053 CONCRETE ENCASEMENT OF STEEL H PILES, HP 12 X 53 (P10L TYPE 3) LF 468.000 _________._____ _________._____ 0110 2501-8400172 TEMPORARY SHORING LUMP SUM LUMP SUM _________._____ 0120 2507-2638650 BRIDGE WING ARMORING - EROSION STONE SY 12.700 _ 0130 2507-3250005 ENGINEERING FABRIC SY 1,361.200 _________._____ _________._____ 0140 2507-6800061 REVETMENT, CLASS E TON 1,171.600 _________._____ _________._____ 0150 2507-8029000 EROSION STONE TON 75.800 _________._____ _________._____ 0160 2526-8285000 CONSTRUCTION SURVEY LUMP SUM LUMP SUM _________._____ 0170 2533-4980005 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0180 2599-9999003 ('CUBIC YARDS' ITEM) FIBER REINFORCED STRUCTURAL CONCRETE (BRIDGE) CY 327.500 ___