Specifications include, but are not limited to: The CONSTRUCTION OF PELLA FIBER TRANSPORT NETWORK WEST TO IMU project includes furnishing and installing all materials for the conduit network containing a fiber optic cable, and the testing of the spliced fiber optic cable. The network will result in a fiber optic connection between the City of Pella’s Central Office (CO) and the CO of Indianola Municipal Utilities in Indianola, Iowa as detailed in the Plan Set. The network is to be constructed within public right-of-way. The entire network cabled network is 42.6 miles in length . It consists of the installation of 206,080 feet of new conduit construction, with an additional 18,894 feet of operator owned conduit which will require fiber installation. The new conduit network installation consists of 102,979 feet of bored conduit (34,578 feet in urban environments and 68,401 feet in rural environments) and an additional 103,101 feet of rural plow/trenched conduit.