Specifications include, but are not limited to: Construction Manager (Boyd Jones) has been engaged for this Project to serve as advisor to DAS and to provide assistance in administrating the Contract for Design between DAS and the Designer according to separate contract between DAS and Construction Manager. DAS is currently seeking design services from qualified firms for a project consisting of ERV Replacement. Design services shall include: 1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover page for a sample contract. 1.3.2 All design disciplines necessary to complete the scope of work. 1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with the Owner, Construction Manager, and Owner’s maintenance staff. 1.3.4 Use of the State of Iowa‘s construction management software program for uploading all documents, submitting and approving pay apps, and construction administration. The cost for the use of the software is paid by the Owner. 1.3.5 At a minimum, design for construction for the following: 1.3.5.1 Review Modus Engineering’s report of the Beje Clark Residential Center HVAC System. 1.3.5.2 Identify and provide opinion on what ventilation components can be salvaged. 1.3.5.3 Creation of construction drawings and specifications for the proper abandonment of the old ventilation system and installation of a new system. 1.3.6 Existing CAD/PDF drawings will be provided to the successful design firm. Accuracy of drawings shall be verified by the design firm. {Include only if OR confirms that there are drawings available} 1.3.7 Field examination of the existing buildings.