Design services shall include: 1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover page for a sample contract. 1.3.2 All design disciplines necessary to complete the scope of work. 1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with the Owner, Construction Manager, and Owner’s maintenance staff. 1.3.4 Use of the State of Iowa‘s construction management software program for uploading all documents, submitting and approving pay apps, and construction administration. The cost for the use of the software is paid by the Owner. 1.3.5 Project Specific Scope: 1.3.5.1 It is anticipated that the modifications completed as part of this project will be contracted directly with Cummins. The successful design firm shall coordinate with Cummins through the design process. 1.3.5.2 Design and construction administration for the complete replacement of the control system for the main switchgear for the Fort Dodge Correctional Facility. This switchgear controls the power from MidAmerican Energy and three existing Cummins generators serving the Fort Dodge Correctional Facility. The existing controller has exceeded its expected useful life and replacement parts are difficult to procure. Power must be maintained throughout the project. 1.3.5.3 Maintain the current sequence of operations and control points that are integrated into the Siemens building automation system with the new system.