A. Bid Package #01 – Boiler Replacement: Trade Contractor shall include all of the following, but not limited to, as part of the contract: 1. Demo Existing Boilers in two (2) phases including associated equipment and concrete bases. a. Install two (2) New Boilers in two (2) phases including associated materials, equipment, and concrete bases. 1) Boiler 1 = phase one (1). 2) Boiler 2 = phase two (2). 3) Boiler 2 to remain in operation during phase one (1). 4) New Boiler 1 to be commissioned and operating prior to phase two (2) start. b. Include all labor, materials, and equipment to complete the project. Also include testing / balancing and Owner training. 2. Includes specification: Division 00, Division 01, 23.05.00, 23.05.05, 23.05.13, 23.05.15, 23.05.17, 23.05.19, 23.05.20, 23.05.23.02, 23.05.23.05, 23.05.29, 23.05.53, 23.05.93, 23.07.19, 23.08.02, 23.11.23, 23.21.23, 23.52.00, 26.05.00 3. Demo to include all of the following, but not limited to as part of the contact: a. Furnish and install all labor, equipment, and materials to complete selective demolition as identified on the contract documents. b. Include all debris removal from site and provide documentation of proper and legal disposal. c. Include all progress cleaning daily for all debris generated by this scope of work. d. Include all permits required by local, state, and federal authorities having jurisdiction for this scope of work. e. Furnish and install all temporary protections, barricades, shoring, scaffolding, supports, and enclosures required to complete this scope of work until complete. Maintain temporary facilities and controls until permanent products being installed. f. Included a broom clean condition at completion of this scope of work. Called “Final Cleaning”. g. Furnish and install all safety equipment and controls to perform the scope of this work that meets or exceeds OSHA, IOSHA, NFPA, NEC, and all other regulatory standards having jurisdiction. h. Coordinate with Construction Manager for all items affecting this package. i. Provide a clean and tidy edge at all cuts and/or core-drilling associated with this scope of work. 4. Boiler Equipment, Components, and Systems to include all of the following, but not limited to as part of the contact: a. Furnish and install all labor, equipment, and materials for work described within contract documents. b. Include all progress cleaning daily for all debris generated by this scope of work. c. Included all permits required by local, state, and federal authorities having jurisdiction for this scope of work. d. Furnish and install all temporary protections, barricades, shoring, scaffolding, supports, and enclosures required to complete this scope of work until complete. Maintain temporary facilities and controls until permanent products being installed. e. Included a broom clean condition at completion of this scope of work. Called “Final Cleaning”. f. Furnish and install all safety equipment and controls to perform the scope of this work that meets or exceeds OSHA, IOSHA, NFPA, NEC, and all other regulatory standards having jurisdiction. g. Coordinate with Construction Manager for all items affecting this package. h. Provide horizontal and vertical chamfered edge to all concrete bases. 5. Propane Tank, all Concrete, Supports, Bollards, Slab, Equipment, Components, and Systems for new boilers to include all of the following, but not limited to as part of the contact: a. Trade Contractor shall include all of the following, but not limited to, as part of the contract: Concrete design for slab, tank supports, bollard fill, etc. b. Furnish and install all labor, equipment, and materials for work described within contract documents. c. Include all progress cleaning daily for all debris generated by this scope of work. d. Include all permits required by local, state, and federal authorities having jurisdiction for this scope of work. e. Furnish and install all temporary protections, barricades, shoring, scaffolding, supports, and enclosures required to complete this scope of work until complete. Maintain temporary facilities and controls until permanent products being installed. f. Include a broom clean condition at completion of this scope of work. Called “Final Cleaning”. g. Furnish and install all safety equipment and controls to perform the scope of this work that meets or exceeds OSHA, IOSHA, NFPA, NEC, and all other regulatory standards having jurisdiction. h. Coordinate with Construction Manager for all items affecting this package. i. Coordinate work with Bid Package #02 Contractor and Construction Manager. j. Furnish and install all labor, materials, and equipment for piping and connections from propane tank to boiler systems. k. Provide horizontal and vertical chamfered edge to all concrete above grade. l. Provide air entrained concrete to all exterior concrete subject to freeze/thaw cycles. Include in concrete mix design submittal.