1 Removal & Disposal of Existing Asphalt Surfaces 2,292 SY $ $ 2 Removal & Disposal of Existing Concrete Surfaces and Platforms 147 SY $ $ 3 Cap Unneeded PVC Storm Mains 3 EA $ $ 4 Cap Sanitary Sewer Service in Parking 1 EA $ $ 5 Abandon or Remove Water Services 291 LF $ $ 6 Disconnect Water Services at the Main 2 EA $ $ 7 Replace Drop Curb with Full 6” Curb and Gutter 35 LF $ $ 8 Install New Water Service 1 EA $ $ 9 Install New Sanitary Sewer Service, if required (pricing only) 1 EA $ $ 10 Remove & Replace Concrete Street 40 SY $ $ 11 Construct Top Portion of Intakes. Install New Castings 4 EA $ $ 12 Install Sump Pump from Intake to Property Line 96 LF $ $ 13 Removal & Disposal of Building Structure (20,665 SF) 1 LS $ $ 14 Remove Chain Link Fence 410 LF $ $ 15 Remove Retaining Wall & Fence 25 LF $ $ 16 Tree Removal 1 LS $ $ 17 Fill 9,681 CY $ $ 18 Topsoil & Grading 5,890 SY $ $ 19 Type 1 Seeding 1.22 AC $ $