This design will involve the installation of an improved storm sewer system along 66th Street and 65th Street between Meredith Drive and Townsend Avenue and on Townsend Avenue from 66th Street to 70th Street. A drainage study was completed in 2021, analyzing the storm sewer systems in eastern Urbandale. This project would upgrade the storm sewer system to current design standards and add storm sewer sump services to all properties. The design will need to determine exact limits and duration. Outlet replacement on the north side of Meredith Drive in Oakwood Open Space is expected, including design of energy dissipation. The installation of the new storm sewer will likely require full street reconstruction. See attached exhibit for locations.